IWCE is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Getting It Right the First Time - Applying Systems Engineering to Transportation Systems

Moderator:

Susan Ronning  (Principal Consultant, ADCOMM Engineering LLC)

Panelists:

John Contestabile  (Director, Public Safety Solutions, Skyline Technology Solutions)

Girija Subramaniam  (Founder, Forcing Function LLC)

Location: W230C

Date: Wednesday, March 27

Time: 2:00 pm - 3:00 pm

Track: Transportation, State & Local Government

Topic: Broadband, Cloud Connectivity, Critical Infrastructure, Cybersecurity, IT & OT, IoT, LMR, Private Networks, Project Management, SCADA, System Resiliency

Format: Panel Session

Vault Recording: TBD

Rail construction projects and programs have historically been run and managed by construction contractors using bid specifications and permit drawings. The technology systems that run the rail networks are something the capital construction managers do not fully understand so they reuse old designs and technology that ultimately result in rework due to outdated and insecure systems and networks.

Takeaways:
Learn how to apply INCOSE systems engineering lifecycle model in the project design process.
Explore how this model ensures the operations and maintenance teams receive a system that is cyber secure, maintainable, and manageable for the next twenty years.