IWCE is part of the Informa Connect Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Conference: March 8-11, 2027
Exhibits: March 10-11, 2027
North Hall, Las Vegas Convention CenterLas Vegas, NV

2027 Agenda

DAS Code Compliance (DASC)

Ira Wiesenfeld  (Consulting Engineer, IWA Technical Services Inc. (IWATSI))
Date: Tuesday, March 9
Time: 9:00 am - 5:00 pm
Track: ETA Technical Training
Format: Training
Vault Recording: TBD

This two-day course gives technicians, designers, contractors, inspectors and authorities having jurisdiction (AHJ's) a working command of the 2027 edition of NFPA 1225. Students first build the radio-frequency foundation needed to understand why the code says what it says — decibels, link budgets, system components, interference and antenna behavior — and then work section by section through Chapter 18 (Two-Way Radio Communications Enhancement Systems), Chapter 20 (Testing and Inspection) and the explanatory material in Annex A. The emphasis throughout is practical: what the requirement is, why it exists, how to meet it in the field, and how to document it so the system is approved the first time and stays compliant for its full-service life.

Prerequisites: None

WHO SHOULD ATTEND

• ERCES / DAS installers, integrators and service technicians

• RF system designers and engineers preparing designs for AHJ approval

• Fire marshals, fire inspectors, plan reviewers and other authorities having jurisdiction

• Two-way radio shop staff and public safety radio system managers (frequency license holders)

• Fire alarm, electrical and low-voltage contractors who interface with ERCES

• Building owners, facility managers and consultants responsible for ongoing compliance

Takeaway

Upon successful completion of this course, the student will be able to:

• Explain the life-safety purpose of ERCES and the roles of the AHJ, the frequency license holder, the building owner and the FCC.

• Apply decibel math, absolute power levels (dBm) and link-budget calculations to in-building coverage problems.

• Identify passive and active DAS architectures, Class A and Class B signal boosters, and every major system component.

• Recognize sources of interference — oscillation, intermodulation, passive intermodulation (PIM), near-far effect, downlink egress and time-delay interference — and the design choices that prevent them.

• Interpret and apply the NFPA 1225-2027 Chapter 18 requirements for approval, personnel qualifications, design, coverage, signal strength and quality, components, cabling, power, monitoring, annunciation and signal booster shutdown.

• Interpret and apply the Chapter 20 requirements for acceptance testing, periodic inspection, annual testing and the five-year quantitative test.

• Use Annex A to understand the intent behind the requirements and to resolve questions of interpretation with the AHJ.

• Plan and document grid testing, delivered audio quality (DAQ) evaluation and acceptance records that satisfy the AHJ.

• Apply safe work practices for RF exposure, rooftop work, electrical power and lockout/tagout.